Skip to content
ryhanah

Assembly guide

RIF Display cabinet

Display cabinet 90×180, door + 2 drawers · 900 × 350 × 1800 mm · Item number rif-display-90

Before you start

  • About 2 h 15
  • Two people needed
  • 2 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

EABFGCDJH ×2K ×2PQI ×5O ×2M ×2N ×2L ×4
Ref.PartSize (mm)Qty
ASide panel left1800 × 330 × 181
BSide panel right1800 × 330 × 181
CTop panel864 × 330 × 181
DBottom panel864 × 330 × 181
EBack panel1698 × 878 × 31
FDivider 1 (left half)1684 × 317 × 181
GDivider 1 (right half)1684 × 317 × 181
HFixed shelf414 × 317 × 182
IAdjustable shelf412 × 307 × 185
JDoor left-hinged625 × 448 × 181
KDrawer front448 × 289 × 182
LDrawer side300 × 220 × 184
MDrawer sub-front353 × 220 × 182
NDrawer back353 × 206 × 182
ODrawer bottom367 × 289 × 32
PPlinth front (recessed 40)864 × 80 × 181
QPlinth back864 × 80 × 181

Hardware

All supplied, in bags.

  • ×20Shelf pin Ø5, nickel
  • ×2Cup hinge Ø35, 110°, free-swinging (no soft-close, for push-to-open), full overlay, with clip plate
  • ×4Euro screw 6.3×13 (hinge plates)
  • ×6Chipboard screw 3.5×16, pan head
  • ×1Push-to-open latch, magnetic
  • ×2Ball-bearing drawer slides, 45 mm, ¾ extension (pair)
  • ×16Beech dowel Ø8×35, fluted
  • ×24Chipboard screw 4×30, countersunk
  • ×4Felt pad Ø28
  • ×28Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×28Cam cover cap Ø15, matching colour
  • ×1Anti-tip wall strap kit (EN 16122)

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    EABFGCDJH ×2K ×2PQI ×5O ×2M ×2N ×2L ×4

    Hardware

    • ×16 Beech dowel Ø8×35
    • ×24 Chipboard screw 4×30
    • ×28 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    EABFGCDJH ×2K ×2PQI ×5O ×2M ×2N ×2L ×4
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    EABFGCDJH ×2K ×2PQI ×5O ×2M ×2N ×2L ×4

    Hardware

    • ×6 Chipboard screw 3.5×16
  5. 5

    Step 5

    Place the shelves

    Push the shelf pins in at the height you want and lay the shelves on them.

    Parts

    EABFGCDJH ×2K ×2PQI ×5O ×2M ×2N ×2L ×4

    Hardware

    • ×20 Shelf pin Ø5
  6. 6

    Step 6

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    EABFGCDJH ×2K ×2PQI ×5O ×2M ×2N ×2L ×4

    Hardware

    • ×2 Ball-bearing drawer slides
  7. 7

    Step 7

    Hang the doors

    Screw the hinges to the doors, clip them onto their plates, then align the doors with the hinge screws.

    Parts

    EABFGCDJH ×2K ×2PQI ×5O ×2M ×2N ×2L ×4

    Hardware

    • ×2 Cup hinge Ø35
    • ×4 Euro screw 6.3×13 (hinge plates)
    • ×1 Push-to-open latch
  8. 8

    Step 8

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  9. 9

    Step 9

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×4 Felt pad Ø28
    • ×28 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp