Skip to content
ryhanah

Assembly guide

HAWA Chest of drawers

Wide chest of 6 drawers · 1400 × 450 × 820 mm · Item number hawa-chest-6-wide

Before you start

  • About 3 h 30
  • Two people needed
  • 3 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

ECDABFGL ×6PQH ×6N ×4J ×2O ×4K ×2M ×8I ×4RS
Ref.PartSize (mm)Qty
ASide panel left720 × 430 × 181
BSide panel right720 × 430 × 181
CTop panel1364 × 430 × 181
DBottom panel (drilled face down)1364 × 419 × 181
EBack panel1378 × 708 × 31
FDivider 1 (left half)684 × 417 × 181
GDivider 1 (right half)684 × 417 × 181
HDrawer front698 × 237 × 186
IDrawer side400 × 187 × 184
JDrawer sub-front603 × 187 × 182
KDrawer back603 × 173 × 182
LDrawer bottom617 × 389 × 36
MDrawer side400 × 192 × 188
NDrawer sub-front603 × 192 × 184
ODrawer back603 × 178 × 184
PBase frame front (set 90 in)1220 × 100 × 181
QBase frame back1220 × 100 × 181
RBase frame side left284 × 100 × 181
SBase frame side right284 × 100 × 181

Hardware

All supplied, in bags.

  • ×6Ball-bearing drawer slides, 45 mm, full extension, push-to-open (tip-on) (pair)
  • ×28Beech dowel Ø8×35, fluted
  • ×90Chipboard screw 4×30, countersunk
  • ×4Felt pad Ø28
  • ×16Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×16Cam cover cap Ø15, matching colour
  • ×1Anti-tip wall strap kit (EN 16122)

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    ECDABFGL ×6PQH ×6N ×4J ×2O ×4K ×2M ×8I ×4RS

    Hardware

    • ×28 Beech dowel Ø8×35
    • ×90 Chipboard screw 4×30
    • ×16 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    ECDABFGL ×6PQH ×6N ×4J ×2O ×4K ×2M ×8I ×4RS
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    ECDABFGL ×6PQH ×6N ×4J ×2O ×4K ×2M ×8I ×4RS
  5. 5

    Step 5

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    ECDABFGL ×6PQH ×6N ×4J ×2O ×4K ×2M ×8I ×4RS

    Hardware

    • ×6 Ball-bearing drawer slides
  6. 6

    Step 6

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  7. 7

    Step 7

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×4 Felt pad Ø28
    • ×16 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp