Skip to content
ryhanah

Assembly guide

NOUR Chest of drawers

Tall chest of 5 drawers · 600 × 450 × 1300 mm · Item number nour-chest-5-tall

Before you start

  • About 2 h 45
  • Two people needed
  • 2 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

EABCDJ ×5F ×5L ×4HM ×4IK ×8G ×2
Ref.PartSize (mm)Qty
ASide panel left1140 × 430 × 181
BSide panel right1140 × 430 × 181
CTop panel564 × 430 × 181
DBottom panel (drilled face down)564 × 419 × 181
EBack panel1128 × 578 × 31
FDrawer front598 × 225 × 185
GDrawer side400 × 175 × 182
HDrawer sub-front503 × 175 × 181
IDrawer back503 × 161 × 181
JDrawer bottom517 × 389 × 35
KDrawer side400 × 180 × 188
LDrawer sub-front503 × 180 × 184
MDrawer back503 × 166 × 184

Hardware

All supplied, in bags.

  • ×5Ball-bearing drawer slides, 45 mm, ¾ extension (pair)
  • ×24Beech dowel Ø8×35, fluted
  • ×63Chipboard screw 4×30, countersunk
  • ×4Tapered solid beech leg 160 mm, oak-stained, Ø38→Ø26, with straight mounting plate
  • ×8Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×8Cam cover cap Ø15, matching colour
  • ×1Anti-tip wall strap kit (EN 16122)

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    EABCDJ ×5F ×5L ×4HM ×4IK ×8G ×2

    Hardware

    • ×24 Beech dowel Ø8×35
    • ×63 Chipboard screw 4×30
    • ×8 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  3. 3

    Step 3

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    EABCDJ ×5F ×5L ×4HM ×4IK ×8G ×2
  4. 4

    Step 4

    Fit the legs

    Screw the legs or their plates into the pre-drilled positions, then stand the piece up.

    Hardware

    • ×4 Tapered solid beech leg 160 mm
  5. 5

    Step 5

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    EABCDJ ×5F ×5L ×4HM ×4IK ×8G ×2

    Hardware

    • ×5 Ball-bearing drawer slides
  6. 6

    Step 6

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  7. 7

    Step 7

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×8 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp