Skip to content
ryhanah

Assembly guide

QAWS Shoe cabinet

Shoe cabinet, 3 tilt-out bins · 600 × 280 × 1458 mm · Item number qaws-shoe-cabinet-3

Before you start

  • About 2 h 00
  • Two people needed
  • 2 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

EABH ×3CDF ×2K ×3GI ×3J ×3L ×3
Ref.PartSize (mm)Qty
ASide panel left1458 × 260 × 181
BSide panel right1458 × 260 × 181
CTop panel564 × 260 × 181
DBottom panel564 × 260 × 181
EBack panel1306 × 578 × 31
FFixed shelf564 × 247 × 182
GPlinth back564 × 130 × 181
HTilt-out front598 × 440 × 183
IBin cheek left288 × 230 × 183
JBin cheek right288 × 230 × 183
KBin bottom502 × 230 × 183
LBin back lip502 × 92 × 183

Hardware

All supplied, in bags.

  • ×10Felt pad Ø28
  • ×48Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×48Cam cover cap Ø15, matching colour
  • ×26Beech dowel Ø8×35, fluted
  • ×1Chipboard screw 4×30, countersunk
  • ×1Anti-tip wall strap kit (EN 16122)
  • ×3Tilt-out compartment pivot pair
  • ×12Chipboard screw 3.5×16, pan head

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    EABH ×3CDF ×2K ×3GI ×3J ×3L ×3

    Hardware

    • ×48 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
    • ×26 Beech dowel Ø8×35
    • ×1 Chipboard screw 4×30
    • ×3 Tilt-out compartment pivot pair
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    EABH ×3CDF ×2K ×3GI ×3J ×3L ×3
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    EABH ×3CDF ×2K ×3GI ×3J ×3L ×3

    Hardware

    • ×12 Chipboard screw 3.5×16
  5. 5

    Step 5

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    EABH ×3CDF ×2K ×3GI ×3J ×3L ×3
  6. 6

    Step 6

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  7. 7

    Step 7

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×10 Felt pad Ø28
    • ×48 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp