Skip to content
ryhanah

Assembly guide

QAWS Sideboard

Sideboard 160, 2 doors + 3 drawers + 1 arched niche · 1600 × 420 × 830 mm · Item number qaws-sideboard-160

Before you start

  • About 3 h 00
  • Two people needed
  • 3 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

ECDABLTRFGHIUJ ×3K ×2Q ×3M ×2SO ×3P ×3N ×6V ×2
Ref.PartSize (mm)Qty
ASide panel left830 × 400 × 181
BSide panel right830 × 400 × 181
CTop panel1564 × 400 × 181
DBottom panel1564 × 400 × 181
EBack panel1578 × 678 × 31
FDivider 1 (left half)664 × 387 × 181
GDivider 1 (right half)664 × 387 × 181
HDivider 2 (left half)664 × 387 × 181
IDivider 2 (right half)664 × 387 × 181
JFixed shelf497 × 387 × 183
KAdjustable shelf495 × 377 × 182
LDoor left-hinged531 × 501 × 181
MDrawer front531 × 195 × 182
NDrawer side350 × 150 × 186
ODrawer sub-front436 × 150 × 183
PDrawer back436 × 136 × 183
QDrawer bottom450 × 339 × 33
RArched niche facade (fixed)530 × 501 × 181
SDrawer front530 × 195 × 181
TDoor right-hinged531 × 501 × 181
UPlinth back1564 × 130 × 181
VCentre support (recessed 216)146 × 130 × 182

Hardware

All supplied, in bags.

  • ×8Shelf pin Ø5, nickel
  • ×4Cup hinge Ø35, 110°, soft-close, full overlay, with clip plate
  • ×8Euro screw 6.3×13 (hinge plates)
  • ×8Chipboard screw 3.5×16, pan head
  • ×3Ball-bearing drawer slides, 45 mm, ¾ extension (pair)
  • ×26Beech dowel Ø8×35, fluted
  • ×43Chipboard screw 4×30, countersunk
  • ×8Felt pad Ø28
  • ×40Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×40Cam cover cap Ø15, matching colour
  • ×1Anti-tip wall strap kit (EN 16122)

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    ECDABLTRFGHIUJ ×3K ×2Q ×3M ×2SO ×3P ×3N ×6V ×2

    Hardware

    • ×26 Beech dowel Ø8×35
    • ×43 Chipboard screw 4×30
    • ×40 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    ECDABLTRFGHIUJ ×3K ×2Q ×3M ×2SO ×3P ×3N ×6V ×2
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    ECDABLTRFGHIUJ ×3K ×2Q ×3M ×2SO ×3P ×3N ×6V ×2

    Hardware

    • ×8 Chipboard screw 3.5×16
  5. 5

    Step 5

    Place the shelves

    Push the shelf pins in at the height you want and lay the shelves on them.

    Parts

    ECDABLTRFGHIUJ ×3K ×2Q ×3M ×2SO ×3P ×3N ×6V ×2

    Hardware

    • ×8 Shelf pin Ø5
  6. 6

    Step 6

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    ECDABLTRFGHIUJ ×3K ×2Q ×3M ×2SO ×3P ×3N ×6V ×2

    Hardware

    • ×3 Ball-bearing drawer slides
  7. 7

    Step 7

    Hang the doors

    Screw the hinges to the doors, clip them onto their plates, then align the doors with the hinge screws.

    Parts

    ECDABLTRFGHIUJ ×3K ×2Q ×3M ×2SO ×3P ×3N ×6V ×2

    Hardware

    • ×4 Cup hinge Ø35
    • ×8 Euro screw 6.3×13 (hinge plates)
  8. 8

    Step 8

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  9. 9

    Step 9

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×8 Felt pad Ø28
    • ×40 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp