
Assembly guide
SAFI Bed
Storage bed 140×190, lift-up base · 1456 × 1956 × 900 mm · Item number safi-bed-lift-140
Before you start
- About 2 h 00
- Two people needed
- 4 packages
Tools
- Cross-head screwdriver
- Allen key (supplied)
- Mallet, or a hammer and a wood block
Parts
Every part carries its letter. Check everything is there before you start.
| Ref. | Part | Size (mm) | Qty |
|---|---|---|---|
| A | Headboard | 1456 × 900 × 18 | 1 |
| B | Side rail left | 1938 × 380 × 18 | 1 |
| C | Side rail right | 1938 × 380 × 18 | 1 |
| D | Foot rail | 1420 × 380 × 18 | 1 |
| E | Centre beam | 1920 × 240 × 18 | 1 |
| F | Storage floor panel | 699 × 638 × 18 | 6 |
| G | Platform frame side | 1908 × 100 × 18 | 2 |
| H | Platform frame end (head) | 1372 × 100 × 18 | 1 |
| I | Platform frame end (foot) | 1372 × 100 × 18 | 1 |
| J | Platform frame centre | 1872 × 100 × 18 | 1 |
| K | Platform panel (ventilated) | 695 × 476 × 18 | 8 |
| L | Ledger cleat, left rail | 1780 × 60 × 18 | 1 |
| M | Ledger cleat, right rail | 1780 × 60 × 18 | 1 |
Hardware
All supplied, in bags.
- ×1Lift-up bed mechanism pair (gas strut + hinge arm), beds 140–180, with fitting template
- ×4Joint connector bolt M6×70, black, flat head Ø13 + barrel nut Ø10
- ×14Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
- ×14Cam cover cap Ø15, matching colour
- ×6Beech dowel Ø8×35, fluted
- ×60Chipboard screw 4×30, countersunk
- ×6Felt pad Ø28
Steps
- 1
Prepare
Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.
- 2
Build the frame
Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.
Parts
Hardware
- 3
Finishing
Fit the screw and cam covers, the felt pads and the accessories.
Hardware
A part missing or damaged?
Send us a photo on WhatsApp with your reservation number and we send the replacement part.