Skip to content
ryhanah

Assembly guide

SAFI Shoe cabinet

Wide shoe cabinet, 2 tilt-out bins · 900 × 280 × 945 mm · Item number safi-shoe-cabinet-2-wide

Before you start

  • About 1 h 30
  • Two people needed
  • 2 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

EI ×2ABCDFL ×2GHM ×2J ×2K ×2
Ref.PartSize (mm)Qty
ASide panel left945 × 260 × 181
BSide panel right945 × 260 × 181
CTop panel864 × 260 × 181
DBottom panel864 × 260 × 181
EBack panel878 × 863 × 31
FFixed shelf864 × 247 × 181
GPlinth front (recessed 30)864 × 60 × 181
HPlinth back864 × 60 × 181
ITilt-out front898 × 440 × 182
JBin cheek left288 × 230 × 182
KBin cheek right288 × 230 × 182
LBin bottom802 × 230 × 182
MBin back lip802 × 92 × 182

Hardware

All supplied, in bags.

  • ×8Felt pad Ø28
  • ×36Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×36Cam cover cap Ø15, matching colour
  • ×18Beech dowel Ø8×35, fluted
  • ×1Anti-tip wall strap kit (EN 16122)
  • ×2Tilt-out compartment pivot pair
  • ×8Chipboard screw 3.5×16, pan head

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    EI ×2ABCDFL ×2GHM ×2J ×2K ×2

    Hardware

    • ×36 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
    • ×18 Beech dowel Ø8×35
    • ×2 Tilt-out compartment pivot pair
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    EI ×2ABCDFL ×2GHM ×2J ×2K ×2
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    EI ×2ABCDFL ×2GHM ×2J ×2K ×2

    Hardware

    • ×8 Chipboard screw 3.5×16
  5. 5

    Step 5

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    EI ×2ABCDFL ×2GHM ×2J ×2K ×2
  6. 6

    Step 6

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  7. 7

    Step 7

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×8 Felt pad Ø28
    • ×36 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp