Skip to content
ryhanah

Assembly guide

SHEBKA Shoe cabinet

Shoe cabinet, 3 tilt-out bins · 600 × 280 × 1488 mm · Item number shebka-shoe-cabinet-3

Before you start

  • About 1 h 45
  • Two people needed
  • 2 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

EABG ×3CDF ×2J ×3H ×3I ×3K ×3
Ref.PartSize (mm)Qty
ASide panel left1328 × 260 × 181
BSide panel right1328 × 260 × 181
CTop panel564 × 260 × 181
DBottom panel (drilled face down)564 × 249 × 181
EBack panel1316 × 578 × 31
FFixed shelf564 × 247 × 182
GTilt-out front598 × 440 × 183
HBin cheek left288 × 230 × 183
IBin cheek right288 × 230 × 183
JBin bottom502 × 230 × 183
KBin back lip502 × 92 × 183

Hardware

All supplied, in bags.

  • ×4Slim steel furniture leg 160 mm, 20×20 square tube, matt black, welded mounting plate + 4 screws
  • ×46Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×46Cam cover cap Ø15, matching colour
  • ×26Beech dowel Ø8×35, fluted
  • ×3Chipboard screw 4×30, countersunk
  • ×1Anti-tip wall strap kit (EN 16122)
  • ×3Tilt-out compartment pivot pair
  • ×18Chipboard screw 3.5×16, pan head
  • ×6Felt pad Ø28
  • ×3Push-to-open latch, magnetic

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    EABG ×3CDF ×2J ×3H ×3I ×3K ×3

    Hardware

    • ×46 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
    • ×26 Beech dowel Ø8×35
    • ×3 Chipboard screw 4×30
    • ×3 Tilt-out compartment pivot pair
  3. 3

    Step 3

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    EABG ×3CDF ×2J ×3H ×3I ×3K ×3

    Hardware

    • ×18 Chipboard screw 3.5×16
  4. 4

    Step 4

    Fit the legs

    Screw the legs or their plates into the pre-drilled positions, then stand the piece up.

    Hardware

    • ×4 Slim steel furniture leg 160 mm
  5. 5

    Step 5

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    EABG ×3CDF ×2J ×3H ×3I ×3K ×3
  6. 6

    Step 6

    Hang the doors

    Screw the hinges to the doors, clip them onto their plates, then align the doors with the hinge screws.

    Hardware

    • ×3 Push-to-open latch
  7. 7

    Step 7

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  8. 8

    Step 8

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×46 Cam cover cap Ø15
    • ×6 Felt pad Ø28

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp