Skip to content
ryhanah

Assembly guide

SHEBKA Bathroom vanity

Vanity unit 80 for a countertop basin, 2 doors · 800 × 450 × 750 mm · Item number shebka-vanity-80

Before you start

  • About 1 h 00
  • One person is enough
  • 1 package

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

ECDFABGHI
Ref.PartSize (mm)Qty
ASide panel left590 × 430 × 181
BSide panel right590 × 430 × 181
CTop panel764 × 430 × 181
DBottom panel (drilled face down)764 × 419 × 181
EBack panel778 × 578 × 31
FShelf (U-shaped, round the siphon)762 × 407 × 181
GDoor left-hinged588 × 398 × 181
HDoor right-hinged588 × 398 × 181
IHanging rail (screwed to the wall)764 × 100 × 181

Hardware

All supplied, in bags.

  • ×4Shelf pin Ø5, nickel
  • ×4Cup hinge Ø35, 110°, free-swinging (no soft-close, for push-to-open), full overlay, with clip plate
  • ×8Euro screw 6.3×13 (hinge plates)
  • ×12Chipboard screw 3.5×16, pan head
  • ×2Push-to-open latch, magnetic
  • ×4Slim steel furniture leg 160 mm, 20×20 square tube, matt black, welded mounting plate + 4 screws
  • ×10Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×10Cam cover cap Ø15, matching colour
  • ×6Beech dowel Ø8×35, fluted
  • ×3Chipboard screw 4×30, countersunk
  • ×3Frame fixing screw 6×100 + plug

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    ECDFABGHI

    Hardware

    • ×10 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
    • ×6 Beech dowel Ø8×35
    • ×3 Chipboard screw 4×30
  3. 3

    Step 3

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    ECDFABGHI

    Hardware

    • ×12 Chipboard screw 3.5×16
  4. 4

    Step 4

    Fit the legs

    Screw the legs or their plates into the pre-drilled positions, then stand the piece up.

    Hardware

    • ×4 Slim steel furniture leg 160 mm
  5. 5

    Step 5

    Place the shelves

    Push the shelf pins in at the height you want and lay the shelves on them.

    Parts

    ECDFABGHI

    Hardware

    • ×4 Shelf pin Ø5
  6. 6

    Step 6

    Hang the doors

    Screw the hinges to the doors, clip them onto their plates, then align the doors with the hinge screws.

    Parts

    ECDFABGHI

    Hardware

    • ×4 Cup hinge Ø35
    • ×8 Euro screw 6.3×13 (hinge plates)
    • ×2 Push-to-open latch
  7. 7

    Step 7

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×3 Frame fixing screw 6×100 + plug
  8. 8

    Step 8

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×10 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp