Skip to content
ryhanah

Assembly guide

HAWA Entryway bench

Entry bench 120 with 2 shoe shelves · 1200 × 350 × 500 mm · Item number hawa-entry-bench-120

Before you start

  • About 1 h 15
  • One person is enough
  • 1 package

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

EHF ×2ABCDIJG ×2KL
Ref.PartSize (mm)Qty
AEnd panel left364 × 350 × 181
BEnd panel right364 × 350 × 181
CCentre leg (left half)364 × 350 × 181
DCentre leg (right half)364 × 350 × 181
ESeat1200 × 350 × 181
FShoe shelf564 × 330 × 182
GBack rail (screwed to the wall)564 × 100 × 182
HBase board (drilled face down)1200 × 350 × 181
IBase frame front (set 90 in)1020 × 100 × 181
JBase frame back1020 × 100 × 181
KBase frame side left204 × 100 × 181
LBase frame side right204 × 100 × 181

Hardware

All supplied, in bags.

  • ×4Felt pad Ø28
  • ×2Frame fixing screw 6×100 + plug
  • ×2Snap-on screw cover cap with washer, matching colour
  • ×34Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×34Cam cover cap Ø15, matching colour
  • ×16Beech dowel Ø8×35, fluted
  • ×12Chipboard screw 4×50, countersunk

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    EHF ×2ABCDIJG ×2KL

    Hardware

    • ×34 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
    • ×16 Beech dowel Ø8×35
    • ×12 Chipboard screw 4×50
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    EHF ×2ABCDIJG ×2KL
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    EHF ×2ABCDIJG ×2KL
  5. 5

    Step 5

    Fit the legs

    Screw the legs or their plates into the pre-drilled positions, then stand the piece up.

    Parts

    EHF ×2ABCDIJG ×2KL
  6. 6

    Step 6

    Place the shelves

    Push the shelf pins in at the height you want and lay the shelves on them.

    Parts

    EHF ×2ABCDIJG ×2KL
  7. 7

    Step 7

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×2 Frame fixing screw 6×100 + plug
  8. 8

    Step 8

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×4 Felt pad Ø28
    • ×2 Snap-on screw cover cap with washer
    • ×34 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp