Skip to content
ryhanah

Assembly guide

HAWA Sideboard

Sideboard 200, wall-hung, 4 doors + 4 drawers · 2000 × 420 × 560 mm · Item number hawa-sideboard-200

Before you start

  • About 3 h 30
  • Two people needed
  • 3 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

ECDWABFGHIJKNVT ×2L ×4M ×4S ×4O ×2U ×2Q ×4R ×4P ×8
Ref.PartSize (mm)Qty
ASide panel left560 × 400 × 181
BSide panel right560 × 400 × 181
CTop panel1964 × 400 × 181
DBottom panel1964 × 400 × 181
EBack panel1978 × 538 × 31
FDivider 1 (left half)524 × 369 × 181
GDivider 1 (right half)524 × 369 × 181
HDivider 2 (left half)524 × 369 × 181
IDivider 2 (right half)524 × 369 × 181
JDivider 3 (left half)524 × 369 × 181
KDivider 3 (right half)524 × 369 × 181
LFixed shelf464 × 369 × 184
MAdjustable shelf462 × 359 × 184
NDoor left-hinged498 × 361 × 181
ODrawer front498 × 195 × 182
PDrawer side350 × 150 × 188
QDrawer sub-front403 × 150 × 184
RDrawer back403 × 136 × 184
SDrawer bottom417 × 339 × 34
TDoor left-hinged497 × 361 × 182
UDrawer front497 × 195 × 182
VDoor right-hinged498 × 361 × 181
WHanging rail (screwed to the wall)1964 × 80 × 181

Hardware

All supplied, in bags.

  • ×16Shelf pin Ø5, nickel
  • ×8Cup hinge Ø35, 110°, free-swinging (no soft-close, for push-to-open), full overlay, with clip plate
  • ×16Euro screw 6.3×13 (hinge plates)
  • ×24Chipboard screw 3.5×16, pan head
  • ×4Push-to-open latch, magnetic
  • ×4Ball-bearing drawer slides, 45 mm, full extension, push-to-open (tip-on) (pair)
  • ×30Beech dowel Ø8×35, fluted
  • ×48Chipboard screw 4×30, countersunk
  • ×5Frame fixing screw 6×100 + plug
  • ×50Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×50Cam cover cap Ø15, matching colour

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    ECDWABFGHIJKNVT ×2L ×4M ×4S ×4O ×2U ×2Q ×4R ×4P ×8

    Hardware

    • ×30 Beech dowel Ø8×35
    • ×48 Chipboard screw 4×30
    • ×50 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  3. 3

    Step 3

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    ECDWABFGHIJKNVT ×2L ×4M ×4S ×4O ×2U ×2Q ×4R ×4P ×8

    Hardware

    • ×24 Chipboard screw 3.5×16
  4. 4

    Step 4

    Place the shelves

    Push the shelf pins in at the height you want and lay the shelves on them.

    Parts

    ECDWABFGHIJKNVT ×2L ×4M ×4S ×4O ×2U ×2Q ×4R ×4P ×8

    Hardware

    • ×16 Shelf pin Ø5
  5. 5

    Step 5

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    ECDWABFGHIJKNVT ×2L ×4M ×4S ×4O ×2U ×2Q ×4R ×4P ×8

    Hardware

    • ×4 Ball-bearing drawer slides
  6. 6

    Step 6

    Hang the doors

    Screw the hinges to the doors, clip them onto their plates, then align the doors with the hinge screws.

    Parts

    ECDWABFGHIJKNVT ×2L ×4M ×4S ×4O ×2U ×2Q ×4R ×4P ×8

    Hardware

    • ×8 Cup hinge Ø35
    • ×16 Euro screw 6.3×13 (hinge plates)
    • ×4 Push-to-open latch
  7. 7

    Step 7

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×5 Frame fixing screw 6×100 + plug
  8. 8

    Step 8

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×50 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp