Skip to content
ryhanah

Assembly guide

RIF TV bench

TV bench 200, 4 drawers + open niche · 2000 × 400 × 440 mm · Item number rif-tv-bench-200

Before you start

  • About 3 h 00
  • Two people needed
  • 2 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

CDETUABN ×2S ×2FGHIJKLMR ×4O ×8P ×4Q ×4
Ref.PartSize (mm)Qty
ASide panel left440 × 380 × 181
BSide panel right440 × 380 × 181
CTop panel1964 × 380 × 181
DBottom panel1964 × 380 × 181
EBack panel1978 × 338 × 31
FDivider 1 (left half)367 × 324 × 181
GDivider 1 (right half)367 × 324 × 181
HDivider 2 (left half)367 × 324 × 181
IDivider 2 (right half)367 × 324 × 181
JDivider 3 (left half)367 × 324 × 181
KDivider 3 (right half)367 × 324 × 181
LDivider 4 (left half)367 × 324 × 181
MDivider 4 (right half)367 × 324 × 181
NDrawer front374 × 336 × 182
ODrawer side350 × 220 × 188
PDrawer sub-front279 × 220 × 184
QDrawer back279 × 206 × 184
RDrawer bottom339 × 293 × 34
SDrawer front373 × 336 × 182
TPlinth front (recessed 40)1964 × 80 × 181
UPlinth back1964 × 80 × 181

Hardware

All supplied, in bags.

  • ×4Ball-bearing drawer slides, 45 mm, ¾ extension (pair)
  • ×20Beech dowel Ø8×35, fluted
  • ×58Chipboard screw 4×30, countersunk
  • ×4Felt pad Ø28
  • ×44Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×44Cam cover cap Ø15, matching colour

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    CDETUABN ×2S ×2FGHIJKLMR ×4O ×8P ×4Q ×4

    Hardware

    • ×20 Beech dowel Ø8×35
    • ×58 Chipboard screw 4×30
    • ×44 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    CDETUABN ×2S ×2FGHIJKLMR ×4O ×8P ×4Q ×4
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    CDETUABN ×2S ×2FGHIJKLMR ×4O ×8P ×4Q ×4
  5. 5

    Step 5

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    CDETUABN ×2S ×2FGHIJKLMR ×4O ×8P ×4Q ×4

    Hardware

    • ×4 Ball-bearing drawer slides
  6. 6

    Step 6

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×4 Felt pad Ø28
    • ×44 Cam cover cap Ø15

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp