Skip to content
ryhanah

Assembly guide

RIF Desk

Desk 140×60 with drawer unit · 1400 × 600 × 750 mm · Item number rif-desk-140-unit

Before you start

  • About 2 h 30
  • Two people needed
  • 2 packages

Tools

  • Cross-head screwdriver
  • Mallet, or a hammer and a wood block
  • Drill for the wall fixing

Parts

Every part carries its letter. Check everything is there before you start.

Parts to scale

AFBCDEHILGJKQ ×3M ×3N ×2R ×4UVOPS ×2T ×2
Ref.PartSize (mm)Qty
ADesk top1400 × 600 × 181
BLeg left, outer board (fluted)732 × 580 × 181
CLeg left, inner board732 × 580 × 181
DLeg right, outer board (fluted)732 × 580 × 181
ELeg right, inner board732 × 580 × 181
FModesty panel1328 × 350 × 181
GTop stiffening rail (hidden)1328 × 80 × 181
HSide panel left600 × 430 × 181
ISide panel right600 × 430 × 181
JTop panel430 × 364 × 181
KBottom panel430 × 364 × 181
LBack panel498 × 378 × 31
MDrawer front398 × 149 × 183
NDrawer side400 × 99 × 182
ODrawer sub-front303 × 99 × 181
PDrawer back303 × 85 × 181
QDrawer bottom389 × 317 × 33
RDrawer side400 × 104 × 184
SDrawer sub-front303 × 104 × 182
TDrawer back303 × 90 × 182
UPlinth front (recessed 40)364 × 80 × 181
VPlinth back364 × 80 × 181

Hardware

All supplied, in bags.

  • ×3Ball-bearing drawer slides, 45 mm, ¾ extension (pair)
  • ×28Beech dowel Ø8×35, fluted
  • ×46Chipboard screw 4×30, countersunk
  • ×8Felt pad Ø28
  • ×28Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  • ×28Cam cover cap Ø15, matching colour
  • ×1Anti-tip wall strap kit (EN 16122)
  • ×1Cable grommet Ø60

Steps

  1. 1

    Step 1

    Prepare

    Open the boxes on a rug or flattened cardboard. Sort the parts by letter and check them against the list.

  2. 2

    Step 2

    Build the frame

    Push the dowels and cam bolts into their holes. Join the sides, top, bottom and dividers, then turn each cam lock a quarter turn.

    Parts

    AFBCDEHILGJKQ ×3M ×3N ×2R ×4UVOPS ×2T ×2

    Hardware

    • ×28 Beech dowel Ø8×35
    • ×46 Chipboard screw 4×30
    • ×28 Cam lock Ø15 + screw-in bolt (drilling distance 24 mm)
  3. 3

    Step 3

    Fit the base

    Screw the base under the frame, lining up its edges before tightening.

    Parts

    AFBCDEHILGJKQ ×3M ×3N ×2R ×4UVOPS ×2T ×2
  4. 4

    Step 4

    Fix the back

    Lay the frame flat, check it is square by measuring both diagonals, then screw the back panel all round.

    Parts

    AFBCDEHILGJKQ ×3M ×3N ×2R ×4UVOPS ×2T ×2
  5. 5

    Step 5

    Fit the legs

    Screw the legs or their plates into the pre-drilled positions, then stand the piece up.

    Parts

    AFBCDEHILGJKQ ×3M ×3N ×2R ×4UVOPS ×2T ×2
  6. 6

    Step 6

    Build the drawers

    Assemble each drawer box, slide the bottom into its groove and screw on the front. Screw the runners into the cabinet, then slide the drawers in.

    Parts

    AFBCDEHILGJKQ ×3M ×3N ×2R ×4UVOPS ×2T ×2

    Hardware

    • ×3 Ball-bearing drawer slides
  7. 7

    Step 7

    Fix to the wall

    Fix the piece to the wall with the supplied hardware, using plugs suited to your wall. Essential for tall or wall-hung pieces.

    Hardware

    • ×1 Anti-tip wall strap kit (EN 16122)
  8. 8

    Step 8

    Finishing

    Fit the screw and cam covers, the felt pads and the accessories.

    Hardware

    • ×8 Felt pad Ø28
    • ×28 Cam cover cap Ø15
    • ×1 Cable grommet Ø60

A part missing or damaged?

Send us a photo on WhatsApp with your reservation number and we send the replacement part.

WhatsApp